Background

As the trees surrounding Casa Grande Union High School grew, their branches began to overhang the school’s roofs, leading to frequent contact with roofing materials. This caused fallen leaves, twigs, and branches to accumulate in roof valleys, gutters, and scuppers. During the rainy season, the buildup blocked proper drainage, leading to water pooling, which increased the risk of leaks, water damage, and deterioration of the roof. The debris also created conditions conducive to mold growth, posing a risk to indoor air quality. As these issues continued to escalate, the district faced rising maintenance costs and potential damage to the school’s infrastructure, making a proactive solution essential.

The Problem

The school’s outdated irrigation system ran continuously for 24 hours, resulting in uneven water distribution. Some areas became oversaturated and slippery, while others remained too dry. The consequences included:

  • Unsafe Conditions: Slippery, soft fields increased injury risks.
  • Limited Field Availability: Excess moisture delayed practices and games.
  • High Maintenance Costs: Water waste and inefficiency drove up expenses.

These challenges required a comprehensive solution to enhance field safety and optimize irrigation efficiency.

The Solution

Casa Grande Union High School partnered with Epifini Landscaping, a trusted expert in irrigation solutions. After assessing the situation, Epifini recommended installing a variable speed pump system to:

  • Reduce irrigation time from 24 hours to just 8 hours.
  • Allow precise control over water distribution.
  • Prevent overwatering and ensure consistent field conditions.
  • Improve safety, maintenance efficiency, and water conservation.
2nd page image

Implementation

Epifini Landscaping executed the project in phases to minimize disruption. The upgrades included:

  • Installing a variable speed pump for uniform water distribution.
  • Adjusting watering schedules to prevent oversaturation.
  • Collaborating with school administrators to ensure timely and budget-conscious completion.

Key Benefits

  1. Enhanced Safety: Even water distribution reduced slippery conditions, lowering injury risks.
  2. Increased Field Availability: Watered fields became playable within hours, preventing schedule disruptions.
  3. Sustainability: Optimized water use reduced waste and supported conservation efforts.
  4. Cost Savings: Reduced water consumption and maintenance expenses freed up resources for other athletic programs.
  5. Improved Field Conditions: The fields remained in playable conditions, and visually appealing.

Results

  1. The transformation of Casa Grande Union High School’s athletic fields brought significant improvements:
  2. Safer Play: Fewer injuries related to wet conditions.
  3. Reliable Scheduling: Teams could practice and compete without unexpected cancellations.
  4. Lower Water Usage: Significant cost savings allowed the school to reinvest in athletics.
  5. Positive Community Feedback: Coaches, athletes, and staff praised the upgraded fields.

Conclusion

The partnership with Epifini Landscaping successfully resolved a long-standing issue. The variable speed pump system provided a safer, more efficient, and sustainable solution, improving field usability and enhancing the school’s athletic program for years to come.